Deception Transfer Pump System
Greenlands Equipment was engaged by Mineral Resources to install an upgraded transfer pump system to increase the flow rate from a mining pit to a discussed pit where the mine water was being discharged. Utilising existing HDPE pipeline infrastructure, Greenlands Equipment provided an innovative pumping solution to increase discharge flow rates. The project consisted of the below main items.
Project Services
- 1 x 132kW transfer pump system
- 1 x 132kW booster pump system
- Solar powered pipeline leak detection system
- Diesel generators for powering of the transfer and booster pump systems
- Installation and commissioning of the pumping infrastructure and leak detection system