NORSEMAN, WESTERN AUSTRALIA
Norseman Gold Bore Field
Greenlands Equipment was engaged by Pantoro to refurbish a historical bore field at the Norseman Gold Mine Site. The project consisted of the below listed main items.
Project Services
- Camera inspection of the existing bore hole
- Redevelopment of the existing bore holes
- Test pumping of the existing bore holes
- Supply of 3 x bore pump systems
- Supply of 1 x transfer pump station
- Integration of a telemetry system that could be accessed by the clients site SCADA system
- Integration of a leak detection system
- Installation and commissioning of the pumping infrastructure and telemetry system
- Installation of the associated 6kM of HDPE pipework to connect the bore field to existing steel trunk main from the upgraded transfer pump station to the process water pond